Indication was found on a long seam weld on a cold reheat link. Removed specimen, analyzed, replaced and issued a final report.
Plug as received from the plant. CES Laboratory analyzed and engineered a plan along with material for full replacement. A report was issued to assure the plant of full load operation within three days.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.